The building was constructed on a flood plain where our expertise in drilling and draining were required. Since this was the tallest building ever built in the Beloit area, needed equipment was not readily available. We were challenged to coordinate the logistics of lifts, scaffolding and other necessary items to complete the construction. |
 |
|